Elite Series
Tight Access Package
$1,650
- Includes bobcat shuttle and mini excavator if needed.
Sprinklers Package
$1,600
Additional Sod
$350/pallet
- Augustine or Bermuda Sod
Super Structure Rebar
$989
- Upgrade rebar in pool to all 1/2″ steel 10″ O/C
- Based on up to 80’
Pool Interior Finish Upgrades
$16-37/foot
- ColorScapes: $16.00 per foot
- QuartzScapes: $29.00 per foot
- StoneScapes: $37.00 per foot
Natural Waterfall Package
$2,980
- Including upsize of pump
- Waterfall with plumbing
- 2-ton moss rock waterfall
- Equipment within 50’ of water fall (3×5)
Energy Savings Package
$4,280
- Upgrade to variable speed pump
- iAqualink Automation (4 function)
- Versa Plumb
- LED light for pool/spa
Base Pool Package Includes:
Architectural Plans
- All plans will be created for construction and a package will be provided for you to turn into HOA
Code Plumbing
- All Code Plumbing will be done by a licensed plumber
- All Code plumbing will meet or exceed all Local, State, & National Code
- Gas lines will be buried a minimum of 18” thick
- All gas lines will be pressure tested to ensure strength in lines
Permitting
- Outdoor Living Pool & Patio will obtain and handle all permitting that is required.
Excavation
- Pool will be laid out for your approval prior to excavation
- All walls will be hand trimmed to ensure proper thickness of walls
- Pool will be over dug to allow for 9” floors
- Access area will be graded out and cleaned up
Tile & Stone Work
- Beam & Waterline will be cleaned and prepped prior to Tile & Coping installation
- Stone will be hand selected to ensure good looking long lasting stone
- All stone will be washed prior to installation
- Premium commercial grade mortar and grout will be used in all applications
- Natural stone coping will be hand chipped on the face
- All waterfalls will be done with very small mortar joints to ensure a very natural look
- ALL TILE & STONE WORK WILL BE DONE BY AWARD WINNING MASONS
Steel Super Structure
- 3/8” Steel will be used to create a (4) bar box beam around the perimeter of the pool
- 3/8” Rebar will be placed 10” O/C in walls
- 3/8” Rebar will be placed 10” O/C in floor
- Deck dowels will be installed to tie pool into deck
- Care will be taken to make sure all steel is proper distance from dirt
Plumbing
- All Plumbing will be schedule 40 P.V.C.
- All Plumbing will be a minimum of 18” deep
- Plumbing trench will be 2ft wide to allow for pipes to lay side by side in trench instead of stacking pipes
- Main Drains will have a separate run to the equipment
Decking
- Deck area will be graded prior to deck installation
- A minimum of 4” of Screened Cushion Sand will be installed as a sub-base under decking
- #3 Rebar will be placed 16” O/C
- Additional Expansion joints will be installed
- All Concrete will have a minimum P.S.I. of 3000
Steel Super Structure
- 3/8” Steel will be used to create a (4) bar box beam around the perimeter of the pool
- 3/8” Rebar will be placed 10” O/C in walls
- 3/8” Rebar will be placed 10” O/C in floor
- Deck dowels will be installed to tie pool into deck
- Care will be taken to make sure all steel is proper distance from dirt
Superior Gunite Structure
- Dry Mix Gunite will be used
- (7) Sack Mix
- Minimum 3000 P.S.I.
- 12” x 12” Bond Beam
- 9” Thick Walls & Floors
- 12” Thick Coves
Interior Finish
- Pool will be scraped and prepped prior to finish being applied
- Pool finish will be hand troweled to ensure a smooth finish
- Finish around steps and light will be a smooth transition
Equipment
- Jandy pool equipment has been rated number one by Consumer Reports
- All Jandy Pool equipment will have a (3) Year Warranty
- Ask about the Outdoor Living “Platinum Warranty”
Start-Up
- Once pool is full of water, Outdoor Living will start-up all pool equipment and add all necessary chemicals needed for the initial start-up process.
- Pool School & Ownership
- Once pool has been running for 7-10 days, a service manager will meet with you and do a very thorough pool school to make sure your ownership experience is very enjoyable.
Electrical
- All Electric will be done by a licensed electrician
- All Electrical work will meet or exceed all Local, State & National code
- GFCI’s will be installed on all outlets
- Pool will be bonded for additional protection

Ready to Discuss Your Outdoor Living Project? Give Us a Call at 972-317-3500!
Take a look at some of our recent projects!
Download Your FREE Pool Planning Guide!
Are you looking at building your dream backyard oasis? Know where to begin planning your dream by downloading our FREE guide.